South Lambeth construction update

The brickwork will continue rising up from the Second floor along the South and North side, the East side will also continue. • The Dryliners will start to stand walls inside with the metal frame work. • The scaffolding will continue on the North elevation throughout the week. • The roofers will continue with the green roof on level six. • Our mechanical contractor will continue works in the tank and plant room. The waste pipes that run through the building will continue to be installed along with the ventilation on the Fifth floor. They will also continue the communal pipework to the flats. • The Dryliners will continue the screed operations throughout the building moving on to the first floor • The Substation will have works continuing internally such as painting. • There will be deliveries for the plumbers, dryliners as well as for the bricklayers thought out the week between 8am to 6pm.

Picture 1 to show Screed to the plant room.

Picture 2 to show Bio Diverse Roof Progress